Construction of ground floor of Shri Ram Janmabhoomi temple will be completed by December in Ayodhya
In January 2024, life will be consecrated in the sanctum sanctorum
Ayodhya, 09 July: The construction work of the divine grand temple being built on Shri Ram Janmabhoomi is going on at a fast pace. The work on the ground floor of the temple will be completed by December.
At present, artisans are doing the work of beautifying the sanctum sanctorum built on the ground floor and carving the idols of gods and goddesses in the pillars. Along with this, work has also started on the first floor.
The temple will be opened for Ram devotees after the Pran Pratishtha ceremony of the temple. Three lakh Ram devotees will be able to see Ram Lala in a day. They will be allowed to enter directly from the Janma Bhoomi Path.
Under the supervision of Shri Ram Janmabhoomi Teerth Kshetra Trust, L&T Company is doing the construction work at a fast pace. Marble flooring will begin on the ground floor. For this, Makrana’s marble is being supplied rapidly.
Trust member Dr. Anil Mishra told that construction has started on the first floor. On the first floor, two and a half feet high stone wall has been made in the prescribed perimeter of the pavilions.
On Sunday, the trust opened the construction work of the temple for live telecast to journalists and cameramen from the country, state and district. Hundreds of people compiled news, took photographs and broadcast live.
On this occasion, the general secretary of the trust, Champat Rai, construction in-charge Gopal ji, the manager of the company engaged in the construction work, the engineer were present.